This week the airplane ramp area gets limed—meaning that lime is mixed with the soil. Water is used during the mixing process. Once the mixture dries out it's hard as a rock. This provides a stable foundation for the asphalt and concrete that goes on top. Meanwhile, work continues on the curtain wall and tile.